
Structural and shop welding
Moment connections, built-up members, stiffeners and plates, welded to CSA W59 under written procedures.
Kortex/Capability/Welding
Welding is the trade the company is built on. Procedures are written for each joint and followed on every one, whether it is a structural moment connection or a stainless counter seam.
Kortex is run by the same people behind AAA Canadian Welding Academy, a registered private career college in Ontario. We train welders for a living, then put the best of them on our own jobs.
That shows up in the small things a contractor notices: procedures instead of improvisation, the right process for the material, clean welds where they will be seen, and documentation your inspector can check in one look.

Moment connections, built-up members, stiffeners and plates, welded to CSA W59 under written procedures.

Column splices, beam connections, repairs and modifications welded on site with our own power and gas.

TIG and MIG in stainless and aluminum for architectural work, food service and anything the finish matters on.
| Element | How we detail it | Typical |
|---|---|---|
| Processes | Matched to the joint and the material: stick and flux-core for structural field work, MIG for production, TIG for stainless and aluminum. | SMAW · GMAW · FCAW · GTAW |
| Procedures | Written welding procedures per joint type, kept on file and followed on every job. | Documentedavailable on request |
| Materials | Carbon steel, stainless 304 and 316, aluminum 6061 and 5052. | Steel · SS · Al |
| Inspection | Visual inspection as standard; third-party NDT arranged where the drawings call for it. | Visual + NDTas specified |
Answered here, so they stop arriving by email.
Our welders are trained through our own registered welding academy and tested on the processes they use. Ask us for the documentation that applies to your project and we will send it.
Yes. TIG and MIG field welding of stainless and aluminum is routine for us, subject to weather and access.
Yes. A cracked bracket or a gate hinge is often how a long relationship starts.
Floor levels, opening, headroom and the structure around it. No charge inside the GTA.
A shop drawing showing the work against your levels, sent for your and your engineer's sign-off.
Sections delivered and field welded. One to three days for a typical residential job.
Welds ground, coating touched up, guard checked, and the site left clean.
Next step
Most welding enquiries are answered the same day. If it needs a site visit to be honest about, we will say so rather than guess.